Marathon Petroleum MPLX Garyville Terminals Marathon Garyville Draft Notice Post-Dredging October 15th, 2021 All drafts are referenced to zero gage at Reserve (mile 138.7 LMR). Draft noted is the maximum draft in fresh water a vessel can have alongside the listed berth, plus/minus Reserve Gage. Garyville Dock 1 (surveyed October 4th, 2021) Maximum draft alongside: 43.0 feet FW +/- Reserve Gage Garyville Dock 2 (surveyed October 6th , 2021) Maximum draft alongside: 43.0 feet FW +/- Reserve Gage Garyville Dock 5 (surveyed October 9th, 2021) Maximum draft alongside: 48.0 feet FW +/- Reserve Gage Ian Burnette Port Captain | Marine 1-(504)-605-9745 imburnette@marathonpetroleum.com