Marathon Garyville Draft Notice
Post Dredging Survey August 22ⁿᵈ, 2024
All drafts are referenced to zero gage at Reserve (mile 138.7 LMR). Draft noted is the maximum
draft in fresh water a vessel can have alongside the listed berth, plus/minus Reserve Gage.
Garyville Dock 1
Maximum draft alongside: 41.5 feet FW +/‐ Reserve Gage

Garyville Dock 2
Maximum draft alongside: 40.0 feet FW +/‐ Reserve Gage
Garyville Dock 5
Maximum draft alongside: 49.0 feet FW +/‐ Reserve Gage

Ian Burnette
Port Captain | Marine 1‐(504)‐605‐9745
imburnette@marathonpetroleum.com