Mississippi River, MSIB Vol XXIII Issue 039 Temporary Waterway Transit requirements and Closure MM 9-10.3 AHP LMR Update 1
June 16, 2023
Mississippi River, update Pipeline removal between MM 9.0 – MM 10.3 scheduled for 0600-1800hrs/20 June 2023
June 15, 2023
Corpus Christi — MSIB 85-23 Worksite Avery Point, Inner Harbor, night time 19JUN-26JUN
June 14, 2023
Rescinded 1432hrs/14th – Mississippi River, Transit draft restricted between MM 9.0-MM10.3 AHP LMR to 45 ft FW
June 14, 2023