Maritime and Federal Updates
Houston Ship Channel, reopened at LB 18 at 1115hrs/06-19-23
Houston Ship Channel, Emergency Closure between LB 18 and the ICW due to an emergency anchored ship in the HSC 0913hrs, June 19, 2023
Corpus Christi, MSIB 86-23 Worksite Tule Lake Turning Basin, Inner Harbor, night time 18-19 June 2023
Mississippi River, MSIB Vol XXIII Issue 039 Temporary Waterway Transit requirements and Closure MM 9-10.3 AHP LMR Update 1
Mississippi River, update Pipeline removal between MM 9.0 – MM 10.3 scheduled for 0600-1800hrs/20 June 2023